Completed Projects

Steel framework - SiloTank

SiloTank have awarded TOT a contract to supply 4No steel frames to support their 50T (Load when full) GRP tanks. This is the second job that Tot have taken on for Silotank in what looks to be a promising working relationship.

 

 

 

 

       

 

 

      

 

 

 

 

 

 

 

   

  

 

Coalisland W.w.T.W

      

 

    

 

                       

  

In conjunction with ITT Sanitaire and Williams Industrial Services.

TOT Technical NI have been requested to supply and install Stainless Steel pipework, walkways, Lifting Gantries and Half Bridge Scrapers for the new Wastewater treatment works in Coalisland.

Flooring Support Steel Work and Lifting Gantry

 

Limavady WwTW - Control Building Fire Escape

Designed and manufactured to suit Building Control Regulations

Fire Escape

Antrim WwTW PST Scraper Bridges

TOT designed, Fabricated and Installed 2No Half Bridge Scrapers for use by NI Water at their Milltown WwTW.

These bridges were required to span 16m.

To keep costs and loads to a minimum Cellular Beams were used to make up the main structure of the bridge.

Scum Boards, V-Notch weir plates, Scum Baffles and Sludge Scrapers were also provided.

RWRG

The customer also required all steelwork below the top water level to be coated in coal tar epoxy. This was carried out before installation to provide the best finish.

 

Latest News

Page 1 of 4  > >>

Jun 21, 2010
Category: Latest News
The RWiP scheme to improve water treatment in rural areas has restarted

Jun 21, 2010
Category: Latest News

Work ongoing in Coalisland


Apr 9, 2010
Category: Latest News

TOT technical to supply SILOTANK with 4no cradles